Community Liaison Group meeting held on 27th March

Cllr Hotchkin, Watts and Robinson of Helpringham Parish Council attended this meeting and have provided some notes of the discussions

 

27th March 2024

Lincs Reservoir Community Liaison Group meeting 2

Project Update- Timescale

2nd Consultation- likely to be held late May.

3rd Consultation (Statutory)- 2025

DCO- 2025/26 (will take approx. 2yrs)

Construction- 2029-40

Individuals can register on the “Planning Inspectorate website” for updates.

 

PRE-SUBMITTED QUESTIONS:

Residential Support Scheme

Feedback has led to amendments, details of which are to be circulated shortly. The scheme is due to be launched around the time of the 2nd consultation. There is NO scheme for those nearby but outside the boundary (ie outside the pink & grey).

Associated Developments

Details of water Treatment works and Pumping stations, etc are still to be finalised as are the upstream transfers from the River Witham and River Trent.

The Emergency masterplan is to be shared at 2nd consultation including visions for the road layout.

How will River Witham fill the reservoir?

Design is progressing, more details available at 2nd consultation.

3D Model

No 3D model will be available at 2nd consultation. Imagery may be available at 2nd consultation.

Emergency Drawdown procedure

Not as advanced as some areas. Some info will be available at 2nd consultation. Requirement to be tested annually.

PROJECT DEVELOPMENTS

Masterplanning

Ongoing with designers/ landscapers. More info will be available at 2nd consultation.

There are quarterly newsletters being sent out. It is possible to subscribe as organisations such as Parish Councils.

Majority of people present were having difficulty receiving these newsletters despite registering.

Environmental Assessments

Surveys are ongoing. A second round of surveys will soon start. Scoping report to be submitted September.

PLANNING FOR CONSULTATION

Online: Website, social media

 Offline: Postcards, newspapers

 Drop in events, online events, pop up events.

RESERVOIR’S EFFECT ON THE WATER TABLE

At the meeting it was stated that Thames Water have acknowledged that in the case of the Abingdon reservoir their proposal for a reservoir would cause the water table to rise by up to 1 metre.

 AW were asked: “What causes this problem and why won’t it also be an issue here?” No engineers were present. AW said they would answer the question at the next meeting.

End of text